Thursday, February 11, 2010

Begin to prepare the room for the overhead loop




Here is a shot of the last lobe of the room that has not had any construction in it yet. In the first picture, you can see the piles of stuff that had accummulated here as the work went on in other parts of the room. I also had shelves full of train boxes that are now under the frame of the layout that is already built.
I disposed of a great deal of boxes, and stuff that I thought I could use but never did. The trash man got a real workout. In the last two pictures you can see the results of the work. The shelves of magazines on the left wall in picture three await a location but everything else has been placed somewhere or thrown out. The last picture looks back to where the branch comes around the corner in the center of the picture where the blue paint ends. The lower storage area is in the left rear.






No comments:

Post a Comment