Tuesday, August 30, 2011

Building the last major section of benchwork


Well, as we approach the end of the bench work phase, I had to do a lot of traveling to get supplies. I went to Richmond to buy more flexible plywood, then to Newport News to get homasote, and lastly to Lowes to get more "white wood". This white wood is a substitute for pine. How I miss the sugar pine I started with. This white wood comes from Scandanavia and it appears to be spruce.
Well, with all the supplies in hand, I painted up some legs (ripped 2X4's) as you can see in the first picture. I am running out of space for the saw as we are down to this narrow alley. In the second picture you see that we are going in front of a door to my shop. I plan to curve the bench work so it does not interfer with the closing of the door.

In the third picture I have started to erect the outside walls of the framing, using the saw horses as a support. I have tied in the base of this section with the existing section back by the TV. Now the quarters are getting tight with the saw very close to the front edge. the pictures are shot from the end of the Northumberland yard. The Dewalt saw box sits on the end of the plywood there.


The next couple of shots show the building of the grid of the benchwork. You see the framing holding the curved portion by the door. It now clears nicely. I plan to have 62 and a 66 inch radius curves come around from the wall to the right here.



We now have the framing done and the bench work is held up temporarily with clamps and studs.

Now, I have made a great many more legs and secured them so the bench work is complete. It has a nice flow into the end of the higher bench work under the yard.
You can see the brackets on the wall for the future building of the branch line that will cross over this aisle on a bridge. This line has to rise to the ceiling to hook into that trackage back there where the red wire is hanging down.

Next I have to set the plywood road bed which I hope to do shortly now that we have power again after the passing of hurricane Irene.

Finishing Subgrade at Milton



Well,

We are now starting the last section of track to get us back to the yard at Northumberland. You can see the end of the hidden yard at the left of the first picture. I have laid the plywood and now must secure it down. Then we start the grade while the subroadbed for Milton goes off to the right and ends by the door. You can see the main line going up to the left. The benchwork is complete to the end of the wall down by the TV. The main will turn left there and go back to the left and up the hill to Northumberland.

In the last two pictures you can see the tool that I am using to set the grade at about 1.85% to bring us up the 8 inches I need to reach the level of the yard.


I am planning to get the bench work done and then place the plywood before I put the homasote in place.

I am reaching the end of major construction and cannot wait to get to the yard trackage.


















Saturday, June 18, 2011

Sheathing the yard.



So, after a quick trip to Home Depot, it took six sheets of cabinet grade plywood to put the base on the box framing. I left a long tongue sticking out as the basis for the start of the grade down to Milton. My next step will be to go back to Milton and build the sub roadbed base there. You can see that area in the first picture to the left of the door. The grade will start up there and go to the upper yard. The pieces of plywood are resting on the framing along the wall where it will make its U turn to go back to the upper yard.


I have to find a special lumber yard in another town to buy the homasote to cover the yard so I can start laying track.



























A surprise visitor



As I am working away, who should show up but my grand daughter Rose. She really wanted to operate a train so we had to stop and let her man the controls . You can see she really enjoyed herself.

Too bad she cannot weild a hammer!



Finishing the challenge - Part 3




So, here we are trying to end the yard framing with a flexible piece of plywood hanging out in mid air.


What I did was to place a strong piece of wood under the benchwork for the branch line and clamp it in place. I then hung a piece of 2x4 that I ripped in half from that piece with a clamp/ Then I clamped the flexible plywood to the vertical piece.


You can see this in the first two pictures.


It gives you a good idea of how everything was hanging out in space. Needless to say, we had a few hickups with this Rube Goldberg contraption.




The last series of shots show how the bench work came out.




One last point that I should make. The rear of the framing had a long span to cover as it crossed over the lower yard throat. In order to broidge this, i ripped two 1X4' s from a piece of furniture grade plywood. Then I screwed and glued them togeteher, essentially creating a 1.5 X4 piece of wood that was pretty strong. You can see it in the last two shots on the left side of the framing of the upper yard.












In the last shots you can see how the curved benchwork came out as the aisle goes back around the yard.































































Taking a break from the upper yard



As I finish the framing up above, I have to get the turnout wiring done and the blocks cut below as it will not be convenient to do this later.

Thus, I have drilled the roadbed to accept the drops from the turnouts. I am using Atlas turnouts but do not trust their wiring to go the distance. So, I am adding feeders to each rail section and the frog.




I am also insulating my block cuts with yellow styrene.

These will then be coated with epoxy and ground to match the profile of the rail. Once this is done, I can finish the wood work above.

















Engineering challenge - upper yard - Part 2


This will be a little tough to follow as I messed up the picture sequence but here goes-
In the fourth picture, you will see that I put up the back member of the framing for the next section of benchwork. Then I suspended several long boards from it to carry the load of the front member of the box framing. The front member has a 1X4 straight piece and two curved pieces of flexible plywood. So, I have to place the straight 1X4 in place so I can set the flexible pieces and tie in the cross pieces.

The fifth picture shows the front 1X4 resting on the temporary support as I align it so the curved portion flows smoothly. I am trying to maintain a 36 inch wide aisle and I have a curved outer portion hanging on the wall here.

The first and second pictures show the board after I have dadoed it to accept the curved plywood at the joint. I also have placed a board at the front of the benchwork section to show me the 36 inch limit point of the curving section of benchwork.


The third picture shows that I have placed the first curved section in place and put in the cross members to stabilize everything.
This was the easier section as it had straight pieces of 1x4 on each end.