Thursday, September 14, 2023
Adding a panel to Shamokin
A higher view that shows the thin nature of the Masonite and the thickness added.
An interior view of the building of the frame. I had to set it so I could fit the upper member below the plywood base of Shamokin.
We are working our way around the frame. I do have one problem and that is the fascia is curved here. So, one of the side frame members has to be of a different thickness than the other to compensate for the curve.
Left side member going into the fascia.
Three sides done.
Now for the thicker side as you can see the fascia bending away.
Adding the additional material to the side member before gluing it to the fascia.
Upgrading automobiles
Here are a couple of diecast models of 1940/50 era pickups that needed to be upgraded a little. So, a friend of mine took some full size Pennsylvania plates from 1956 that I purchased on eBay and Photoshopped them down to O scale size. I have begun a project of adding them to all my vehicles. It does make a difference in their appearance. I have applied about 30 thus far.
Saturday, November 19, 2022
A View of the completed tank cars
Next are the 10,000 gallon Chemical cars. These are the easily modified cars. This one is an older release - a Warren car. These cars stand up well next to the Precision brass models of the same class of cars.
This is a new one - a Hercules Chemical car that is very distinctive.
Lastly, one for my Standard Oil of NJ, carrying LPG.
This gives you a view of the car ends with the couplers and air hoses
You can see they line up.
And the cars look good from down low as well.
Thursday, November 17, 2022
Now we need an additional throttle
This throttle came as components that were somewhat pre-wired. The base has a portion of the circuitry and the throttle body has the rest.
My problem is that the throttle body is connected to the base by 6 wires. Those wires connect to the pins on the right side of the blue circuit board. So, I decided to put a connector on the side of the box to make it easier to screw the wires from the layout to the throttle.
On the box in the background, you can see the 8 pin connector that I am using. I am actually building two of these throttles as the crew likes them so much, I am having to add one to Reed to make the switching there easier. In this view, you can see that the fuse body is on the base as I could not fit it on the top. The on/off switch is also on the base next to the 8 pin connector (shown on the rear box).
The tops are pretty simple as all I can mount are the transformer and the circuit card.
I am trying a different transformer but I am not really satisfied with its characteristics so will go back to the Stancor. This one is a center tap 24 Volt unit, but it does not have the power output I want.
Here is the completed appearance of the unit but it is also where my problems began. I used a Chinese made fuse holder for these. I had just bought them off Amazon. They were awful. I could not get them to screw on or off reliably. I was using choice words as the last thing I do is fuse the circuit and I could not get the cap off. The darn things cam eina package of 8 and everyone was faulty. So, I have a 50 year old, but unused, Bussman fuse holder and that will go into the circuit. Once I did that, and connected those six colored wires to the terminal block and my hand held throttle, I found that the unit works great.
Now I have to come up with a new/old way of connecting a 6 pin plug and socket that will stand up to some usage. The cheaper Chinese ones are not too dependable. I have found a source for "new stock" Cinch-Jones plugs which, while more expensive, are industrial strength.
In closing, I mentioned that the RixRax throttle was from the mid 1980's. I needed another one and went out on eBay to find the one for Reed. Could you believe it, but a guy had just listed a "new old stock" one. I bought it immediately. It is good that I am not the only one holding on to things for eons! That Bussman fuse holder was from a stock I was given as demo's when I joined the company in sales in 1968! I left them in 1969 but they are still paying out!
Some Power Supplies for Shamokin
Using my hole drills, I cut mounting holes for the power cord and inserted it with a stress reliever.
The stress relief required a bigger hole than I had a cutter, so I used a Dremel cutter to complete the hole and mount the plug.
Here I had gathered the components and used my cutters to cut the mounting holes.
This is the layout for the top with the transformer on one side, the fuse ahead of it, and the on/off switch next to the power strip. The Power strip has three positions - plus, center, and minus. The feeds come from underneath the top.
Here we see the bottom before all wiring is done. The center tap of the transformer is the Zero voltage, and each side of the bridge rectifier will be plus or minus 3 volts.
And here is the simple wiring and we are done, once I connect the line cord to the fuse holder and the on/off switch. So, when I tested the supply, it did not work. Darn!! then, going back and trouble shooting, I found I had a defective transformer. So, I got a new one and inserted it and then it was exactly 3.15 volts on either side. Perfect! Thank goodness!
Taking a break and converting some Atlas tank cars to true 2 rail operation
On the 8K cars, you need to mill out the frame to accept the kadee coupler box as once you set the car at the right height, the coupler would be very low. This shows a bottom view of the mounted box after I milled about 0.050 out of the center sill and then drilled and tapped the center sill. I also had to make a bolster ring (0.060 thick) that raises the car on the Athearn truck to meet the Kadee height gauge. I had drilled out the bolster on the Athearn truck to allow it to sit on the Atlas pin. I used Atlas's truck screw after I turned down the diameter of the head. Here is an end view with the coupler mounted. On some cars I used the Atlas air hose. On other cars, I used a cast rubber air hose.
Here is the line-up of the completed frames awaiting the bodies return.
Saturday, October 29, 2022
Completing the Track Work into Shamokin
Glue is dried and the tops of the ties have been sanded.
A look down the track to see where we have to connect to the trackwork back by the factory.
The first turnout is now built and the second is under construction. This is a little tricky as the turnouts are on a surface where the grade is ending and then flattening out. Also, I am standing on two stools and my head is pressed into the ceiling.
The second turnout is just about done, and I realize I have to extend the wooden ties by at least a couple to provide space for the ties of the diverging tracks to be placed.
Now the track beyond the turnouts has been placed. You can see there are a lot of sweeping curves involved in smoothly blending into the tail tracks. The left most track is a future siding for a building flat that will be placed along the wall.
An overview of the whole junction
A distance shot of the town of Shamokin, less a few structures. Now, on to the wiring.