Earlier, I showed the work Paul and Alan did to put up the webbing and the rosin paper. Here is their second night's output, which is the plaster cloth, covering with Structolite. This area took them about 2.5 hours to complete with the two coats as they put them on simultaneously. The bridge from Paxinos is in the foreground.
It will become a wooded area as the yard went into the woods from its eastern side which ended in the town proper. So the buildings in the back of the photo are where the town begins and proceeds to the right.
Looking back towards the bridge to Paxinos.
Tuesday, June 23, 2015
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment