This gives a view of the three stages of completion of a section. First I got some lighting in place as I worked over boxes and lumber. Next came finishing the ceiling and heat ducts. Lastly I prepared the floor for the tile and laid it. Here we have the completed bay with everything done, before I moved the boxes intothe space so I could continue around the basement. This space is about 700 square feet. Overall, the basement area for the layout is about 2000 square feet. We also have a shop and a work room for spraying and sand blasting.
Tuesday, April 14, 2009
This gives a view of the three stages of completion of a section. First I got some lighting in place as I worked over boxes and lumber. Next came finishing the ceiling and heat ducts. Lastly I prepared the floor for the tile and laid it. Here we have the completed bay with everything done, before I moved the boxes intothe space so I could continue around the basement. This space is about 700 square feet. Overall, the basement area for the layout is about 2000 square feet. We also have a shop and a work room for spraying and sand blasting.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment