Wednesday, December 14, 2011
Starting on building the Main yard
As you can see, we are coming up the hill from the horseshoe curve after Milton. We are approaching the main yard limits by the power pack. The homasote is down and I am starting to lay out the location of the crossing from the westbound main to the eastbound main to allow the trains to come out of the yard up by the saw. The drill track will end by the power pack.
Another view of the trammel that shows you how the yard bends around in a 180 degree curve. The yard tracks will be about 40 feet long so I will have a decent capacity for freight cars. When I finish laying this out, I will be able to drill the yard from both ends. Thus, I will put a caboose track on each end for convenience.
The goal for the next month is to get one track complete through the yard (the westbound main) so the grandchildren will finally see a train run around when they come for Christmas so time is running out!
Another view of the trammel that shows you how the yard bends around in a 180 degree curve. The yard tracks will be about 40 feet long so I will have a decent capacity for freight cars. When I finish laying this out, I will be able to drill the yard from both ends. Thus, I will put a caboose track on each end for convenience.
In this view I am showing that I have elevated the main tracks 1/4 inch above the yard tracks. The Arrival/Departure tracks are 1/8 inch higher than the yard. When I lay the tracks, the main will be code 140 as will the Arrival/Departure tracks. The yard will be code 125. All this is an effort to show the lighter duty track that the yard was generally laid with. I will also vary the ballast color.
This is a view of the east end of the yard. the throat of the freight tracks will be between the yellow card stock (used to try to even out the variances in thickness of the homasote) and the coke can. To the right of the Coke can, the engine service tracks and, hopefully, a small passenger car yard will peel off to the right.
This is an overview of the area that will house the diesel storage (beyond the red and white box) the turntable (center rear), the roundhouse (far left rear), and the passenger car yard. The main will continue
off to the right of the wide column and the branch will form the end of the drill track and parallel the main beyond the column. I still have to cut the last of the homasote and lay it in down by the column.The goal for the next month is to get one track complete through the yard (the westbound main) so the grandchildren will finally see a train run around when they come for Christmas so time is running out!
Tuesday, December 13, 2011
Still working up the hill
Well, you can see that I have built the curve up to the staright away which will soon have us at the yard limits. I will continue with this process until I reach teh top of the hill at the entrance to the Northumberland Yard. We have measured the length of the yard tracks and they are 40 feet long. So, I will have to build a pretty long drill track on each end for the switchers to use.
Coming up the hill
|
The horseshoe curve is now built. We are coming up the hill to Northumberland. After the plaster is dry (two coats) we then paint the whole surface with flat black paint to simulate cinders.
|
Continuing to build the main line
Well, I have a new computer and a new operating system and needless to say, I am having some learnings about how to post to the blog. It started with problems loading the pictures, now posting the text and who knows what else will be a problem. That is why there have not been any posts for a while. But we are struggling up the learning curve and this is the first evidence of progress. Meanwhile, I have continued working on the layout so you will see some concentrated postings to catch you up on where we are now. I have build all the substructure for the main and am now trying to get the homasote down. These shots show the building out from the hidden siding into Milton which is just west of the main yard. You can see the laying of the cut roadbed, the N scale cork that is used for super elevation on the curves and then the plaster shoulders in palce. We are approaching the big horse shoe curve at the end of the room that turns us back up hill towards Northumberland.
Tuesday, September 6, 2011
Finishing the main line - Part 2
Well, here we go! I have completed the roadbed and spliced it together while it was on the framework. Then, I temporarily raised it up so I could cut the end where it meets the yard. I did not splice that to allow it to float while I set the actual grade.
There is a sag in the roadbed as I have not established the final grade. It turns out that it is a bit steep so I made the grade 1.85% on the curved portion to compensate for the drag of the train on the curve. I stiffened the grade to 2.3% on the long straight away as that will be about the same rolling resistance.
I have left the trammel in place so I do not have to re-establish the center point.
Installing the last of mainline sub roadbed Part 1
Well, it took me about a week but I have finished with the subroadbed for the main line. My biggest problem was horsing a piece of 4X8 by 3/4 inch plywood up onto the bench work. Once there, I used my trusty trammel, as shown in the first picture, to draw the outline of the roadbed. I started over by Milton on the right and, as shown in second picture, came around the bend to begin the long climb up to the yard.
The reach rod is a 1/2 inch angle left over from trimming in a storm door a long time ago.
Subscribe to:
Posts (Atom)