Construction will have to stop for a while as I go back to wiring and a control panel or two so I can test what is already down.
Wednesday, December 1, 2010
Bridges over the Susquahanna
Construction will have to stop for a while as I go back to wiring and a control panel or two so I can test what is already down.
Just about done
I have not cut and secured the top as I have a large group coming this Saturday and do not have time to complete that. I have to move into a major clean up to make it all presentable.
Adding the cross members to the yard
First I put the short leg onto the perimeter as seen in the first two shots. While this torqued the side rail, I was able to take that out once I had he support in place.
After all the long members were done, I added blocking because I needed to tie everything together due to the expanses. Later I added legs in the center as well. It came out pretty strong as I was able to use the cross members as parallel bars with no flexing.
You can see I had to use a lot of clamps in the process as I had to put a long straight member above the member I was joining together to be sure that it was straight as well. You can see that set up in the third photo. The legs went on last, once I had all the cross members and the bridging in place..
You can see I had to use a lot of clamps in the process as I had to put a long straight member above the member I was joining together to be sure that it was straight as well. You can see that set up in the third photo. The legs went on last, once I had all the cross members and the bridging in place..
Outling the area
As we are looking at a very large area, I thought I could put the exterior framing together and then raise it up to make putting the interior in easier. Well, it turned out to not be easy at all but I found that out after I was underway. The kids were here for Thanksgiving so I used my three son-in-laws to help me get it up on temporary legs . My wife only allowed me to have the guys in the basement for an hour so that was all I could get done.
You can see the framing is in place and the special corner work has been attached. All the other cut pieces are on the floor. We did mark the rails where those cross sections were to go but I had a lot of splices to make as I am working with 8 foot pieces. You do get a better sense of the size once it was in the air.
Making curved corners
So, just like building a wooden model airplane, we have to make some formers. The first shot shows two cut out of 3/4 inch plywood. They will form the top and bottom of the corner. I also had to cut an inset for the bendable plywood so it would be flush with the side rails.
In the second shot, you can see the two plates in place, along with the special cuts I had to make in the side rails to tie them in. I made tongues to mate up with the bendable plywood and match the depth of the inset cuts in the 3/4 inch plywoood. I also backed the side rail up with 1 inch by 1 inch reinforcing to strengthen the joint.
The third shot shows how they looked after they were in place and then covered with the bendable plywood. In the last shot, you can clearly see how the 3/4 plywood ties into the side rail and the bendable plywood then makes the corners. I am pleased how they came out.
The third shot shows how they looked after they were in place and then covered with the bendable plywood. In the last shot, you can clearly see how the 3/4 plywood ties into the side rail and the bendable plywood then makes the corners. I am pleased how they came out.
Starting to make the engine facility framing
The next step will be to make the special framing for the curved corners.
Starting to layout the yard
So, now that we can see clearly, we start to layout the engine terminal area as the main comes into the yard. First we cover the floor with our brown paper so we can transfer the information from the computer design onto it. This gives us our actual dimensions. You can see the straight edges and the bendable wood stringers that I use to get easement curves. The tracks will come around the corner from the beige wall in the distance and then curve to the left. the steam engine terminal will be the first thing we pass on the right. You can see the approximate location of the turntable on the floor. The roundhouse will be to its left. The dimensions of the 6 stall roundhouse are drawn on that roll of brown paper you see. I am surprised by how large it is. The benchwork will actually come all the way to the shop vacuum as the diesel house will be right above that point.
I have also erected a beam over Herndon the get the angle that I will need to allow the yard to cover the 8 storage tracks below. You can see that clearly in the first photo. I was a bit disappointed that the angle was so shallow that I lost a whole corner of Herndon so I have to rethink the layout of that town. I believe I will have a road bridge cross the tracks at that same angle so the tracks disappear into a tunnel under the bridge. More on that later.
Subscribe to:
Posts (Atom)